Photos by Al Neufeld, VE7AN.
![](http://sarc.ca/wp-content/uploads/2019/11/IMG_7019-1024x683.jpg)
RNH – Firing up the generator
![](http://sarc.ca/wp-content/uploads/2019/11/IMG_6994-1024x683.jpg)
RNH – cleaning all the paint off the wall so the adhesive will stick properly
![](http://sarc.ca/wp-content/uploads/2019/11/IMG_7045-e1574643004606-683x1024.jpg)
RNH – Peter bolting the plate to the wall
![](http://sarc.ca/wp-content/uploads/2019/11/IMG_7049-1024x683.jpg)
RNH – Steel plate now bolted through the wall
![](http://sarc.ca/wp-content/uploads/2019/11/IMG_7083-1024x683.jpg)
RNH – Checking out the solar panels.
![](http://sarc.ca/wp-content/uploads/2019/11/IMG_7100-1024x683.jpg)
RNH – Lower steel plate replaced – Oct 2019
![AHR - October 2019 service](http://sarc.ca/wp-content/uploads/2019/11/IMG_7284-1024x683.jpg)
AHR – Oct. 2019. Phil and Mike servicing repeater
![](http://sarc.ca/wp-content/uploads/2019/11/IMG_7302-e1574643465159-683x1024.jpg)
AHR – Oct. 2019
![](http://sarc.ca/wp-content/uploads/2019/11/IMG_7312-e1574643441966-683x1024.jpg)
AHR – Oct. 2019 servicing
![](http://sarc.ca/wp-content/uploads/2019/11/IMG_7331-e1574643418185-683x1024.jpg)
AHR – Phil checking the vitals, Oct. 2019